• Log In

Weird Flex but OK

Lifting Arm for SMRT Train Door Maintenance

Week 10 – 19 Jul: Electrifying Success

28 Jul 2019, Sun Uncategorized No Comments

We decided to add the wheels into the trolley.

This video shows how we prepared the wheels.

wheel setup

We also had to cut the protruding screws that hold the wheel to the base as these screws were blocking the wheels’ proper rotation.

wheel cut

Lastly, this video shows the wheels in action! They are extremely heavy duty as these 6 wheels can carry a combined weight of up to 8 tonnes! Those are some pretty heavy duty wheels.

wheel working

 

Moving on, We also 3d design and printed housing for arduino + two dc motor controllers and wires. The two DC Motor controllers will be on the left, and the Arduino board will be on the right.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Before we attach the components onto this 3d-printed base, we decided to wire all actuators with dc motor controllers + arduino, modified arduino code (to accommodate all 3 actuator systems + the shift from Ardunio Mega to Arduino Due) and tested the system (success!).

Lastly, we soldered many wires, including the variable resistor to wires and we are currently testing it.

Week 10 – 18 Jul: What's a Bell Crank? (feat. Timelapse)

Week 11 – 22-25 Jul: Tidying it up & putting it all together

Leave a Reply Cancel reply

Archives
  • July 2019 (19)
  • June 2019 (10)
  • May 2019 (1)
Flexing and Grinding
July 2019
M T W T F S S
1234567
891011121314
15161718192021
22232425262728
293031  
« Jun    
Proudly powered by WordPress | Theme: Doo by ThemeVS.