We have finally gotten around to modifying that particular Bell Crank design. Now, our arm is able to go down all the way to right above the base of the trolley (where the pneumatic units will be parked) and is able to go up to the height of 3m. Hurrah!!!

https://blogs.ntu.edu.sg/ps9888-2019-weirdflexbutok/files/2019/07/bell-crank.mp4

Over the past few days, we have also managed to attached the Arduino + two dc motor controllers with all wires to our 3d-printed housing on the primary arm. This is a close up.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

This is a shot from farther way

.

 

 

 

 

 

 

 

 

 

 

 

 

 

We also connected everything to the battery, placed on the base, instead of the power supplies

Week 10 – 19 Jul: Electrifying Success

Week 11 – 26 Jul: Final Lift (or is it)

Leave a Reply Cancel reply

Archives
  • July 2019 (19)
  • June 2019 (10)
  • May 2019 (1)
Flexing and Grinding
July 2019
M T W T F S S
1234567
891011121314
15161718192021
22232425262728
293031  
« Jun    
Proudly powered by WordPress | Theme: Doo by ThemeVS.