May 20 – May 27
Planning and discussing our idea
Jun 15 – Jun 29
Designing and building the rotational base
Jun 25 – Jul 2
Testing the motor for the base
Designing the support for base and motor
Studying and labelling the wiring inside the printer
Jul 4 – Jul 9
Testing autohome of printer using marlin (not successful)
Modifying the design for the support
Assembling the printer with base, stepper motor and support
Jul 12 -16
Troubleshooting the autohome
Installing an extension of CNC Shield for extra stepper motors
Designing the holder for water bath beaker
Jul 19 – Jul 23
Installing the Relay Module