Start of Renovation
The WGW Library has begun its renovation and the expected completion date of renovation is October 2007....
New Study Bench
A reading bench was added next to the windows at level B3 to cater to users who might need to use their laptops in the Library. It has altogether...
Expansion of Library Staff Office
The staff area was expanded in July 2007 to provide space for ACRC staff. After the expansion a total of 4 staff cubicles and a discussion area were created....
Design Brief
The purpose of the brief is to provide a broad concept plan and guide for the interior design and layout of the WGW Library. This concept plan will describe...
New Wang Gungwu Library
A project was initiated by Chinese Heritage Centre (CHC) and NTU to have the WGW Library placed under the management of NTU Library. Our plan is to renovate the...
Design Brief
The Library is writing the design brief for the new interim HSS Library. The purpose of the design brief is to provide a broad concept plan and guide for...
Installation of Acrylic Boards to Staircase
New acrylic boards were added to the metal railing of the main staircase in the Library. The boards were added for modesty reasons as the metal railing was quite...
Opening of ADM Library
Renovation at the ADM Library was completed in December 2006 and the Library was operational in January 2007. The Library is divided into two main areas, identified by 2...
Planning of New Interim HSS Library
Due to the rapid growth of the Chinese and English language humanities and social sciences collections in the existing HSS Library at S3.2-B5, shelving space has reached its maximum...
Design Brief for LWNES Library
The Library completed the writing of the 42-page design brief for the expansion of the LWNES Library. Around 300 LWN Library student users took part in an online survey...